Value Packs / Manufacturing / Process Control Parameter Optimisation / Brief

A wash tank on Line 1 sat above its learned band for six hours, and the line never stopped

All lines · 31 July · daily · Defect rate and each parameter's band index against the band that line has learnedProcess Control Parameter Optimisation · Brief 01
The single finding

Wash tank 3 on Line 1 left its learned band at and stayed out for six hours. It peaked at in two consecutive hours and still read at nine. Defect rate on the line reached , and Line 1 was the only line outside its own band all day. Inside the Line 1 and SKU-4417 slice the same measure reads . Wash tank 1 on the same line and product moved late, to . Conveyor speed held at and the line kept running through all six hours. The other parameters on the line each held inside its own band all day.

So what? A parameter can sit inside everything the equipment allows and still be wrong for the product being made. That is why every threshold on the line stayed correctly silent. Six hours of drift on one circuit is a controller, a sensor or a valve, and all three can be checked.

At a glance
Defect rate · Line 1537.50K

537.50K vs 168.91K

the only line outside its band

PLC parameter band index · wash tank 3 at its peak56 °C

56 vs 39 °C

two consecutive hours

PLC parameter band index · wash tank 3 at nine49 °C

49 vs 39 °C

six hours out and still out

Defect rate · Line 1 and SKU-4417537.50K

537.50K vs 496.12K

the slice inside the line

Quality yield % · Line 1 and SKU-441787.08

87.08 vs 79.85

above its own, so not the product

Conveyor speed · Line 147.00K

47.00K vs 48.00K

inside its running range

Every line against its own learned band

Defect rate · every line against its own learned band

One band per line, because each runs different products at different speeds.

Line 1SKU-4417 running · against its own 168.91K
537.50K
Line 4against its own 197.40K
191.60K
Line 2against its own 181.00K
172.40K
Line 3against its own 166.20K
158.90K
Line 5against its own 154.80K
149.20K

The line on each bar is that row’s own expected level. The scale runs from 0 to 600.

Defect rate on Line 1 reached and the line was the only line outside its own band all day. Every band here is learned for that line rather than set once for the plant. That is the only reason one line stands out on a measure all five carry.

Wash tank 3, hour by hour

Wash tank 3 and wash tank 1, hour by hour · Line 1

The band is what this parameter holds on this line running this product.

30 °C40 °C50 °C60 °C
00:0003:0006:0009:00
Wash tank 3Wash tank 1the band this parameter holds on this line and product

Wash tank 3 left its band at , peaked at and was still reading six hours later. Wash tank 1 held its own band through all of it. A long excursion rather than a spike is what points at the controller, the sensor or the valve.

Parameter against hour, across the whole circuit set

Parameter against hour · the whole circuit set on Line 1

Nineteen parameters are read; these are the five that carry any movement.

03:0006:0009:0019:00
Wash tank 350 °C56 °C49 °C38 °C
Wash tank 138 °C37 °C38 °C48 °C
Curing temperaturein bandin bandin bandin band
Conveyor speedin rangein rangein rangein range
Line pressurein bandin bandin bandin band

One parameter of nineteen carries the morning, and wash tank 1 on the same line and product moved to in the evening. The other parameters each held inside its own band all day. Maintenance checks one circuit family rather than nineteen parameters, which is the difference the grid makes.

What every other reading rules out

Each against its own level, on the same day and the same line.

Reading31 July, against its own levelWhat it rules out
PLC parameter band index · wash tank 356 °C against its own 39nothing — this is the finding
Quality yield % · Line 1 and SKU-441787.08 against its own 79.85the product and the recipe
Conveyor speed · Line 147.00K against its own 48.00Kdowntime, and a stopped-line artefact
PLC parameter band index · the other eighteeneach inside its own bandthe line as a whole
The equipment's own limit56 °C was inside ita hardware breach — which is why nothing alarmed
What is leftthe wash tank 3 circuita controller, a sensor or a steam valve

Quality yield on the slice came in at , so the product context is not failing. Conveyor speed held at and the line kept running through all six hours, so this is not downtime. The peak at was inside what the equipment allows, which is why a threshold alarm on the hardware limit never fired.

What it costs while it runs
Defect rate · Line 1537.50K

537.50K vs 168.91K

a full day of production

PLC parameter band index · wash tank 3 at nine49 °C

49 vs 39 °C

and not yet corrected

Defect rate · Line 1 and SKU-4417537.50K

537.50K vs 496.12K

the product that was running

Defect rate on the line reached across a full day of production, and on the product that was running it reached . Wash tank 3 was still at at nine, so the count is not closed. What none of these readings can say is which of the controller, the sensor and the steam valve is at fault.

The three insights that matter most
1

Defect rate picked the line, not quality

Defect rate on Line 1 reached and the line was the only line outside its own band all day, while quality yield on the slice came in at .

Why it matters: It names which measure did the work, so the next read starts in the same place rather than at the product.

537.50KDefect rateLine 1, against its own 168.91K
2

A long excursion, not a spike

Wash tank 3 left its band at , peaked at and was still above its band at six hours later.

Why it matters: A spike is a reading. Six hours is a controller, a sensor or a valve, and all three are checkable while the shift is still on.

56 °CPLC parameter band indexwash tank 3, against a 39 band
3

The line kept running, which is the point

Conveyor speed held at and the line kept running through all six hours while the parameter drifted.

Why it matters: A defect spike with the line stopped is a downtime artefact. This one happened on running production, so the defects are real output.

47.00KConveyor speedLine 1, inside its running range
You could ask next
↑

What was the controller setpoint on wash tank 3 through those six hours?

Separates a setpoint change from a failing sensor or valve.

⚠

How many products ran on Line 1 inside the window?

Sizes the product exposure rather than the parameter one.

⊕

Has wash tank 1 moved late on other days?

Tests whether the evening move is the same circuit family or a one-off.

?

What does wash tank 3 do on Line 2 on the same product?

The control: if it holds there, the circuit is the cause rather than the recipe.

↗

Which parameters sit closest to their learned band right now?

The same read, run before the next excursion.